Case Studies
As part of the National Environmental programme for AMP 4, Phosphorous removal is required to meet an annual mean of 1mg/1.
Full Case Study
The project at Chickhenhall Lane was for the electrical installation of the conveyor systems and polymer dosing systems.
Full Case Study
The contract was to carry out feasibility studies, including the design, supply, installation and testing of disinfection systems.
Full Case Study
As part of the National Environmental programme for AMP 4, Phosphorous removal is required to meet an annual mean of 1mg/1.
Full Case Study
Pewsey sweeper contract included the design, manufacture and installation of: 3 No. Motor Control Centres, Kiosk, Poly Dosing, Washwater & Systems
Full Case Study
Works included the design, supply and installation of PLC controlled raw turbidity panels, mechanical pipework and electrical installation.
Full Case Study
The scheme at Warminster was for the design, manufacture and installation of Motor Control Centres.
Full Case Study
Murray Control Systems Limited
Unit 8a & 8b
Tower Industrial Estate
Tower Lane, Eastleigh
Hampshire
SO50 6NZ
Email : info@murraycontrolsystems.co.uk
Tel: 023 8065 0377
Fax: 023 8061 0558

023 8065 0377