Case Studies

Abbottsbury
Abbottsbury

As part of the National Environmental programme for AMP 4, Phosphorous removal is required to meet an annual mean of 1mg/1.

Full Case Study Read Story
 
Chicken Hall Lane
Chicken Hall Lane

The project at Chickhenhall Lane was for the electrical installation of the conveyor systems and polymer dosing systems.

Full Case Study Read Story
 
Disinfection Scheme
Disinfection Scheme

The contract was to carry out feasibility studies, including the design, supply, installation and testing of disinfection systems.

Full Case Study Read Story
 
Hurdcott
Hurdcott

As part of the National Environmental programme for AMP 4, Phosphorous removal is required to meet an annual mean of 1mg/1.

Full Case Study Read Story
 
Pewsey
Pewsey

Pewsey sweeper contract included the design, manufacture and installation of: 3 No. Motor Control Centres, Kiosk, Poly Dosing, Washwater & Systems

Full Case Study Read Story
 
Turbidity Scheme
Turbidity Scheme

Works included the design, supply and installation of PLC controlled raw turbidity panels, mechanical pipework and electrical installation.

Full Case Study Read Story
 
Warminster
Warminster Sewage Treatment Works

The scheme at Warminster was for the design, manufacture and installation of Motor Control Centres.

Full Case Study Read Story
 

© Murray Control Systems Ltd 2010. All Rights Reserved

Murray Control Systems Limited

Unit 8a & 8b
Tower Industrial Estate
Tower Lane, Eastleigh
Hampshire
SO50 6NZ

Email : info@murraycontrolsystems.co.uk
Tel: 023 8065 0377
Fax: 023 8061 0558

Contact Us